Automatic doors believe that we are not unfamiliar, many public places have automatic doors installed, because of the ease of use of automatic doors, it also greatly facilitates the life of everyone, so what are the steps to install automatic doors?
Here is a detailed introduction for everyone. In general, the installation of automatic doors only need six steps to get it done, but the installation of automatic doors is still relatively complex, after all, involves a lot of knowledge of the principle of things many people do not know enough about, so it is recommended that the installation test by professional personnel.

Step1: when the entrance of a building needs to install automatic doors, the responsible party will be on the Internet or through other channels to find the information to be installed automatic doors and automatic door company. By calling to understand the brand of the automatic door to be installed, as well as the size of the doorway and the actual situation on site.
Step2: the sales staff and engineering personnel personally to the scene to measure the size and see the actual situation, and the responsible party to talk about the specific program.
Step3: the business staff will come up with a CAD design of the automatic door, make a detailed quotation program sent to the responsible party to look over, and so the responsible party feels that everything is no problem, the automatic door company's business staff will sign an automatic door installation and commissioning contract with the responsible party, the contract is signed after the automatic door company's engineering department personnel began the automatic door accessories preparation work, such as ordering glass, ordering Stainless steel and other accessories.

Step 4: After all the equipment is ready, the automatic door company's engineering department personnel to start the construction, first of all, the installation of an automatic door track, track to be firmly installed in support of the iron frame, (iron frame generally with 12 # or 14 # channel steel + 4 # angle steel firing) necessary to burn a gantry on the doorway fixed in the doorway, so as to better fit the automatic door track, the gantry The material should be based on the size of the doorway, the weight of the force to choose the profile. Installation of this gantry must be vertical, horizontal, solid, the plane of the installation of the track must be flat, so as to ensure that the track can be installed up into a horizontal-vertical state, in the installation will generally have a professional level measuring instruments to assist in completing this work.
Step 5: When the track is installed, the door body-specific size can be accurately produced, if the aluminum alloy frame or stainless steel frame, the size will be adjusted according to different brands of automatic doors, when the automatic door body is completed, the automatic door company personnel should bring the company's personnel valid documents, automatic door equipment sets and other accessories into the field for installation, installation time of about 1-2 working days a set of doors.
Step 6: When the automatic door all the accessories have been installed, followed by automatic door debugging, general automatic door debugging including automatic door speed and slow speed, slow distance, etc., but also pay attention to other accessories have been working properly, including automatic door special electric locks, access control card machine, fingerprint machine, security electric eye, etc..